Based in Foshan Sanshui, ASPER serves stainless and metal engineering across Guangdong — railings, covers, acoustic enclosures and liquid-cooling manifolds — with drawing detailing, batch fabrication and on-site installation.
Sanshui base scheduling, dedicated delivery across GD cities
CNPC R&D Phase II, Shenzhen Finance Center enclosures
Tender/CAD re-detailing, 24h quotation
Fabrication + finishing + install + acceptance
CNPC R&D Phase II enclosure, Shenzhen Finance Center enclosure, Lingnan No.1 landscape, HRB Fengtang bridge 316 railing.
Yes — GZ, SZ, Zhuhai, Dongguan and other GD cities via Sanshui base.
24h three-sheet linked quotation after drawing detailing.
Typically 7–20 days; expedited scheduling available.
Yes — test reports, detailing drawings and qualification files.
139-2484-8661, email jeson2002@126.com.
图纸深化 → 打样确认 → 批量交付 → 现场验收,全程有兜底
24 小时内出具三表联动报价单(参数设置表 + 综合单价分析表 + 工程量清单)
邮箱 jeson2002@126.com | 广东省佛山市三水区云东海街道驿北路5号碧桂广场一区12座209之一